Welcome To Senior Design Day!

Below are over 60 projects students with the Ingram School of Engineering have spent months developing for this two-semester sequence course.

All links and project pages will be active starting at 8AM May 4th.

Civil Engineering Projects

These Civil Engineering projects are at the midpoint of a
two-semester sequence. They are not complete.

  • C1.01 Environmental Remediation of Raptor Refinery 
    C1.02 HILLCAT Engineering Inc. - Affordable Housing Development 
    C1.03 Affordable Housing 2 
    C1.04 Water Transmission Pipeline 
    C1.05 Fishtrap Road, Roadway Expansion and Improvements 
    C1.06 Southeast Library and Community Center 
    C1.07 Wastewater Treatment Plant Expansion

These Civil Engineering projects are at the endpoint of a
two-semester sequence. They are functionally complete.

  • C2.01 Water Transmission & Elevated Storage Tank 
    C2.02 Groundwater Treatment Plant Design 
    C2.03 Iron Removal from Water via Sedimentation 
    C2.04 2026 WEAT Student Design Competition 
    C2.05 Residential Land Development 
    C2.06 Concrete Canoe 
    C2.07 Water Transmission Project


Electrical Engineering Projects

These Electrical Engineering projects are at the midpoint of a
two-semester sequence. They are not complete.

  • E1.01 Radtopus
    E1.02 Ground Control
    E1.03 Watts Up
    E1.04 Ready Set Go
    E1.05 Radiant Streets
    E1.06 Autobots
    E1.07 Talos
    E1.08 Magnetronics
    E1.09 Autonomous Prime

These Electrical Engineering projects are at the endpoint of a
two-semester sequence. They are functionally complete.

  • E2.01 RadDAWGs 
    E2.02 Password: b0bc@t 
    E2.03 Diamond Dogs 
    E2.04 NXP Peripheral Integration 
    E2.05 Mazed & Confused 
    E2.06 WayFinder 
    E2.07 HDL FPGA 404: BOT_Not_Found 
    E2.08 Smooth Operators 
    E2.09 Vertical Minds 
    E2.10 Torque Titans 
    E2.11 Dojo Drive 
    E2.12 KongBot 
    E2.13 ZillaBot 
    E2.14 Ripple Effect


Industrial Engineering Projects

These Industrial Engineering projects are at the midpoint of a
two-semester sequence. They are not complete.

  • I1.01 3D Simulation of Fulfillment Process
    I1.02 Integrated Preventive Maintenance Tracking and Equipment Performance Dashboard

These Industrial Engineering projects are at the endpoint of a
two-semester sequence. They are functionally complete.

  • I2.01 Computer Vision-Based MOST Analysis of Disassembly Operations
    I2.02 Robotics Health Dashboard
    I2.03 Modeling & Simulation of Academic Makerspace with AnyLogic
    I2.04 Humidity Control Center


Manufacturing Engineering Projects

These Manufacturing Engineering projects are at the endpoint of a
two-semester sequence. They are functionally complete.

  • M2.01 Automated Pneumatic Press
    M2.02 3-Axis Composite Filament Winder
    M2.03 VR & Digitization Experience
    M2.04 Anylogic Simulation
    M2.05 Digital Twin Foundations for the Ingram Makerspace


Mechanical Engineering Projects

These Mechanical Engineering projects are at the midpoint of a
two-semester sequence. They are not complete.

  • ME1.01 Quiet Cooling System for Semi-Open Air Sports Simulator Bays 
    ME1.02 Soft Robotic Gripper to Handle Fruits 
    ME1.03 Soft Robotic Gripper to Handle Fruits 
    ME1.04 Drivetrain for TXST Formula SAE Vehicle 
    ME1.05 Chip Handling System 
    ME1.06 Sit-to-Stand Trainer (STS-T) 
    ME1.07 Sit-to-Stand Training Device

These Mechanical Engineering projects are at the endpoint of a
two-semester sequence. They are functionally complete.

  • ME2.01 TDC-106 Lunar and Mars Surface Habitat Module Manufacturing
    ME2.02 The Meadows Center Diving Buoys
    ME2.03 Low-Pressure Injection Molding Machine
    ME2.04 Mini Golf Hole Redesign
    ME2.05 FSAE Passive Interconnected Hydraulic Suspension

Want To Help Fund Our Next Senior Design Day?

A donation toward Senior Design can be used to support a specific project, materials, and even the event. Your support could help our students create more impressive end results.