Brushy Creek Regional Wastewater Plant Expansion.

Sponsor: Ingram School of Engineering (ISoE) 
Student Team: Yaneli Aguilar, Jocelyn Saucedo, Jessica Gonzalez, Isabella Gallinger 
Faculty Instructor: Dr. Felipe Gutierrez

C1.07 Logo
C1.07 Logo

Recent population growth in the Brushy Creek Regional Wastewater System – East Plant (BCE) service area has driven the need for a 10 MGD expansion to accommodate the increasing wastewater flows. The proposed improvements focus on expanding treatment capacity, modernizing aging infrastructure, and maintaining reliable operations while the facility remains in service. This project integrates community needs with operational efficiency and long-term reliability, ensuring the wastewater system can sustainably serve the region for years to come.

C1.07 Poster Pitch

To view a PDF file of our poster, click the link below!

C1.07 Poster.pdf

Team Contact Information

C1.07 Group Photo
From left to right (Jocelyn Saucedo, Isabella Gallinger, Yaneli Aguilar, Jessica Gonzalez)

Team Project Manager: Yaneli Aguilar, uvy9@txstate.edu

Faculty Instructor: Dr. Felipe Gutierrez , wgy8@txstate.edu


Let us know what you think! You can evaluate our project here: C1.07 Evaluation Form