C2.07 - Industrial Site Development
Detailed design of infrastructure for facility.
Sponsor: CUDE Engineers
Student Team: Jaxon Coates, Kara Erfurth, Jose De La Sancha Arce, Jacoby Hernandez
Faculty Advisor: Dr. Felipe Gutierrez

In this phase, the industrial facility's infrastructure will be designed in detail. The stormwater management system will be designed to local and state regulations and we analyze the impact on the surrounding area and existing infrastructure. The sanitary sewer system will be sized appropriately to suit needs and connect to exiting sewer lines. The water supply system will be designed to meet the demand of the facility and the fire protection plan. The sites pavement will employ a variable thickness design to better meet the needs for private and commercial vehicles.
C2.07 Presentation
Video not playing? You can also view our presentation by clicking the link below!
C2.07 Poster Pitch
To view a PDF file of our poster, click the link below!
Team Contact Information
Team Project Manager: Jaxon Coates, wze3@txstate.edu
Faculty Advisor: Mr. Felipe Gutierrez, wgy8@txstate.edu

Let us know what you think! You can evaluate our project here: C2.07 Evaluation Form