C2.07 - Industrial Site Development

Detailed design of infrastructure for facility.

Sponsor: CUDE Engineers  
Student Team: Jaxon Coates, Kara Erfurth, Jose De La Sancha Arce, Jacoby Hernandez 
Faculty Advisor: Dr. Felipe Gutierrez

C2.07 Logo
C2.07 Logo

In this phase, the industrial facility's infrastructure will be designed in detail. The stormwater management system will be designed to local and state regulations and we analyze the impact on the surrounding area and existing infrastructure. The sanitary sewer system will be sized appropriately to suit needs and connect to exiting sewer lines. The water supply system will be designed to meet the demand of the facility and the fire protection plan. The sites pavement will employ a variable thickness design to better meet the needs for private and commercial vehicles.

C2.07 Presentation

Video not playing? You can also view our presentation by clicking the link below!

C2.07 Project Presentation

C2.07 Poster Pitch

To view a PDF file of our poster, click the link below!

C2.07 Poster.pdf

Team Contact Information

Team Project Manager: Jaxon Coates, wze3@txstate.edu

Faculty Advisor: Mr. Felipe Gutierrez, wgy8@txstate.edu

C2.07 Group Photo
From left to right (Jose De La Sancha Arce, Jacoby Hernandez, Kara Erfurth, Jaxon Coates)

Let us know what you think! You can evaluate our project here: C2.07 Evaluation Form