C2.03 - San Marcos Wastewater Force Main
Force main design for the City of San Marcos.
Sponsor: Freese and Nichols
Student Team: Cameron Saunders, Raul Torres, Ethan Williams
Faculty Advisor: Dr. Felipe Gutierrez

Due to the increasing population in San Marcos Texas, there is a need to improve the conveyance of wastewater in the surrounding developments to the city’s wastewater treatment plant. We are tasked by Freese and Nichols to design a wastewater force main to operate with an existing 6 MGD lift station with considerations regarding alignment such as TxDOT and county right of way, private land parcels, permitting and regulations, and environmental factors. The selection of material and pipeline size was be based on flow capacity, durability, cost, and city and state regulations. A system design approach is taken with considerations to the hydraulics and alignment involved. Our design will ensure a reliable and cost-effective force main that enhances the City of San Marcos wastewater infrastructure and supports future growth.
C2.03 Presentation
Video not playing? You can also view our presentation by clicking the link below!
C2.03 Poster Pitch
To view a PDF file of our poster, click the link below!
Team Contact Information
Team Project Manager: Ethan Williams, fov5@txstate.edu
Faculty Advisor: Dr. Felipe Gutierrez, wgy8@txstate.edu

Let us know what you think! You can evaluate our project here: C2.03 Evaluation Form