C1.06 - Water Transmission Project
Central Texas water transmission line.
Sponsor: HDR & GBRA
Student Team: Darrell Anderson (PM), Ana Jaimes-Leal, Diego Guerra, Sam Koester
Faculty Advisor: Dr. Felipe Gutierrez

The project involves designing a water transmission line that will extend from South Austin to Lockhart, TX, with the goal of enhancing regional water distribution and meeting the growing demand for the region. The pipeline will incorporate engineering design aspects and hydraulic design principles to ensure efficiency, reliability, and long-term sustainability. The project aims to support residential, commercial, and industrial growth while improving water security in the region.
C1.06 Poster Pitch
To view a PDF file of our poster, click the link below!