Securing water for Central Texas’ future.

Sponsor: HDR & GBRA 
Student Team: Darrell Anderson (PM), Ana Jaimes-Leal, Sam Koester 
Faculty Advisor: Dr. Felipe Gutierrez

C2.06 Logo
C2.06 Logo

The project involves designing a water transmission line extending from the southern portion of the City of Austin to the City of Lockhart, with the goal of enhancing regional water distribution and meeting the region’s growing demand. The pipeline will incorporate various engineering design elements, along with a detailed hydraulic analysis, to ensure efficiency, reliability, and long-term sustainability. The project aims to support residential, commercial, and industrial growth while addressing water scarcity and strengthening water security in the region. 

C2.06 Presentation

Video not playing? You can also view our presentation by clicking the link below!

C2.06 Project Presentation

C2.06 Poster Pitch

To view a PDF file of our poster, click the link below!

C2.06 Poster.pdf

Team Contact Information

Team Project Manager: Darrell Anderson, dma147@txstate.edu

Faculty Advisor: Dr. Felipe Gutierrez, wgy8@txstate.edu

C2.06 Group Photo
From left to right (Sam Koester, Darrell Anderson, Ana Jaimes-Leal)

Let us know what you think! You can evaluate our project here: C2.06 Evaluation Form