Land development with a focus on drainage and grading.
Sponsor: Kimley-Horn
Student Team: Brianna Reyes, Alex Espinosa, Alejandro Jr Lopez
Faculty Advisor: Dr. Felipe Gutierrez
Continuing from last semester, we are working on the same hotel site but focusing on different aspects of land development. This time, the focus will be placed on stormwater management and site grading. For stormwater, we will size grate inlets, pipes, and a retention pond. To do this, we will use the City of San Marcos standards and flow-modeling software. With grading, we will create a 3-D surface and try to minimize the total cut/fill of the site. These two components were chosen because they are fundamental elements of land development and are commonly addressed by engineers in practice.
C2.04 Presentation
Video not playing? You can also view our presentation by clicking the link below!
C2.04 Poster Pitch
To view a PDF file of our poster, click the link below!
Team Contact Information
Team Project Manager: Brianna Reyes, jps185@txstate.edu
Faculty Advisor: Dr. Felipe Gutierrez, wyg8@txstate.edu
Let us know what you think! You can evaluate our project here: C2.04 Evaluation Form