Land development with a focus on drainage and grading.

Sponsor: Kimley-Horn
Student Team: Brianna Reyes, Alex Espinosa, Alejandro Jr Lopez
Faculty Advisor: Dr. Felipe Gutierrez

C2.04 Logo
C2.04 Logo

Continuing from last semester, we are working on the same hotel site but focusing on different aspects of land development. This time, the focus will be placed on stormwater management and site grading. For stormwater, we will size grate inlets, pipes, and a retention pond. To do this, we will use the City of San Marcos standards and flow-modeling software. With grading, we will create a 3-D surface and try to minimize the total cut/fill of the site. These two components were chosen because they are fundamental elements of land development and are commonly addressed by engineers in practice.

C2.04 Presentation

Video not playing? You can also view our presentation by clicking the link below!

C2.04 Project Presentation

C2.04 Poster Pitch

To view a PDF file of our poster, click the link below!

C2.04 Poster.pdf

Team Contact Information

Team Project Manager: Brianna Reyes, jps185@txstate.edu

Faculty Advisor: Dr. Felipe Gutierrez, wyg8@txstate.edu

C2.04 Group Photo
From left to right (Alex Cruz, Alejandro Jr. Lopez, Brianna Reyes, Jeremiah Soliz)

Let us know what you think! You can evaluate our project here: C2.04 Evaluation Form